Nuclear reactors and Smart Meter/Smart Grid hacking dangers

Could the Fukushima disaster happen to our nearest nuclear reactor?

Daily reports on the worsening Fukushima disaster are here:  ENE News www.enenews.com

It doesn’t take an earthquake or tsunami to start a chain reaction of events. All it takes is a electrical grid failure. That’s how vulnerable all nuclear reactors are.

Main points:

  •  Nuclear reactors depend on off-site grid power.
  • If power grid is shut off for any reason, including due to hacking or an electromagnetic pulse or solar storm, back-up generators must instantly come on at full power to insure continuous cooling of fuel rods and reactor cores. Those generators must continue to operate at full power until grid power is restored.
  • The diesel generator backup system currently in place will probably fail in the event of an emergency. These generators aren’t adequately maintained. They must be warmed up and run at low speed for a period of time before going to full speed. And they are only built to be run for a limited period of time at full speed.
  • At least two of the Fukushima generators failed before the tsunami hit. When the generators were turned on, they broke.
  • Each Smart Meter is vulnerable to hacking and provides a vector to the grid. Smart Meter and Smart Grid components make the electrical grid much more susceptible to cyber-attacks. Those attacks could shut down a neighborhood, a city, the entire grid, or target critical facilities.

From Analysis: Smart Meter and Smart Grid Problems, p. 74-76

 

————————————————————————————————————————————————————–

“Nuclear reactors depend on external electrical power for their energy requirements.

Arne Gundersen:

…the most likely type of a nuclear accident is caused by a loss of offsite power.  That is what happened at Fukushima:  the power system AROUND the plant broke down.  If that happens, not only will the plant not have power, but the street lights won’t work.  According to the NRC, the street lights DO work.  Not only that, but your home lighting won’t work and your radio and TV won’t work.  But according to the NRC, you will be able to contact the outside world by phones or by radio or by television.

But remember the most likely cause of a nuclear accident is loss of offsite power and that has NEVER been part of an emergency plan, assuming that all of that does not work.

http://fairewinds.com/content/white-house-nrc-recommend-50-mile-fukushima-evacuation-yet-insist-us-safe-only-10

If power is disconnected to these facilities, from whatever cause, generators must be relied on instantly to function. Energy must be available constantly to keep fuel rods and reactor cores cool.

A failure In this system, a failure in being able to shut down a reactor safely, could result in a nuclear disaster at each and every nuclear reactor, not just in California, but across the United States, affecting all of us.

That would create Fukushimas many times over.

Greg Palast in Vulture’s Picnic:

A page from the notebook of an Emergency Diesel Generator expert, R.D. Jacobs, hired to monitor a test for a nuclear reactor’s back-up cooling system.

This is to record that on my last visit,….I pressed [a company executive] saying that we just did not know what the axial vibration of the crankshaft was doing to the [diesel] units. I was unable to impress him sufficiently.

The diesels were “tested” by turning them on for a few minutes at low power. They worked find. But R.D., a straight shooter, suspected problems. He wanted the motors opened and inspected. He was told by power company management to go to hell.

When we forced the plant builder [in Suffolk County, New York] to test the three Emergency Diesel Generators in emergency conditions, one failed almost immediately (the crankshaft snapped, as R.D.[Jacobs} predicted), then the second, then the third. We named the three diesels “Snap, Crackle, and Pop.”

…I knew that all these diesels were basically designed, or even taken from, cruise ship engine rooms or old locomotives. . I’m not an engineer, but I suspect a motor designed for a leisurely float n Bermuda is not fit for a life-and-death scramble. So, I asked [an industry insider], “They really can’t work at all, the diesels, can they?”

That’s when he introduced me to the phrase “crash start.”

On a ship, he explained, you would take half an hour to warm up the bearings, and then slowly build up to “critical” crankshaft speed, and only then add the “load.” the propeller…

That’s for sailing. But in a nuclear emergency, “the diesels have to go from stationary to taking a full load in less than ten seconds.”

Worse, to avoid having to buy additional diesels, the nuclear operators turbo-charge them, revving them to 4,000 horsepower in ten seconds when they are designed for half that output.

The result: snap, crackle, pop.

I learned that, at Fukushima, at least two of the diesels failed before the tsunami hit. What destroyed those diesels was turning them on. In other words, the diesels are junk, are crap, are not capable of getting up to full power in seconds, then run continuously for days….

”So, you saying emergency diesels can’t work in an emergency?”

“Actually, they’re just not designed for it.”

p. 294-297

This is the present system in place to protect all of us in case of a power outage to nuclear reactors.”

 

 

Posted in Uncategorized | Leave a comment

Jan. 28, San Francisco: “The High Road to a True Smart Grid”

An interdisciplinary expert panel will present a program at the Commonwealth Club of California Tuesday, January 28, 2014, from 12:00 – 3:00 p.m., called “The High Road to a True Smart Grid”. The program will cut through misunderstandings about the value of the ‘smart meters’ being rolled out across the country, and the misguided direction of electricity and energy policy in the U.S. The panelists will outline a blueprint for a safer and smarter approach to both electricity generation and distribution in the United States—one that has all of our best interests, and the interests of planet Earth, at heart. Complimentary light buffet will be served from 11:30 a.m. until noon. Download Flyer for Sharing (PDF)http://electromagnetichealth.org/wp-content/uploads/2013/10/Flyer-Commonwealth-Club-Getting-Smarter-About-the-Smart-Grid.pdf To RSVP, please contact the Commonwealth Club of California at www.commonwealthclub.org/events/2013-12-03/high-road-true-smart-grid or 415-597-6700

Tickets: $32 non-members, $20 members, $10 students (with valid ID)

 “The High Road to a True Smart Grid” Billions of dollars of ‘smart’ utility meters are being installed across America that are unable to integrate with, or enable, the ‘smart grid’ of the future on which U.S. energy sustainability depends, according to the landmark report, “Getting Smarter About the Smart Grid” published by the National Institute for Science, Law and Public Policy in Washington, D.C. Called a colossal waste of taxpayer and ratepayer dollars, the new meters and networks do not improve energy efficiency, enhance energy management, help balance supply and demand, or facilitate the integration of renewable sources.  Instead the meters drive up costs, introduce unnecessary risks to personal privacy and health, and divert resources from creating a true smart grid. Join us to dive deeply into the roots of electricity paralysis in the United States and learn what it will to take to create a reliable, safe, and sustainable electricity grid with our planetary interests at heart. Learn:

  • How state and local governments, and environmental organizations, have been misled about the purported benefits of ‘smart’ meters.
  • How ‘smart’ meter investments, using billions in stimulus funding, do not benefit ratepayers or support economic growth, but financially prop up  unsustainable Investor-Owned-Utilities (IOUs), while postponing investment  in genuine ‘smart’ technical solutions and the inevitable transition to a      decentralized and democratized electricity system.
  • How conflicts of interests in the IOU monopoly utility business model are preventing us from moving to a renewable energy economy.
  • Why the utility industry is so desperately pushing back against rooftop solar and net metering?
  • Why the right to ‘opt out’ of ‘smart’ meters will not solve the pressing  underlying risks and economic problems, nor will exploiting more fossil fuels, and why opt-outs may make the situation worse.
  • How “smart meters” may be a surveillance “drone” in your home.
  • How  U.S. policymakers evidence a lack of a basic understanding of the problems associated with the future of energy and electricity.
  • Why local communities need to take control of their energy future, as we are seeing happening now in Boulder, CO.

More information: http://electromagnetichealth.org/electromagnetic-health-blog/smart-grid-dec-3/

Posted in Uncategorized | Tagged , , | Leave a comment

Sebastopol City Council bans Smart Meter installations

Yesterday morning, at a specially scheduled meeting, the Sebastopol City Council voted unanimously to adopt an ordinance banning Smart Meter deployment in the city and impose a $500 fine for violations. Sebastopol became the 15th California government to adopt an ordinance. The city council also approved a resolution directed at the California Public Utilities Commission (CPUC).

The city had previously requested a moratorium as well as health and safety studies, but PG&E began installing Smart Meters and antennas anyway. The ordinance states that PG&E did not obtain permits for installations in the public right of way as required by law, and did not consult with the city, as ordered by the CPUC in land use matters.

The ordinance cites the city’s legal authority to take this action under the California Constitution as well as in Public Utilities Code Section 2902, which reserves the city’s right to “supervise and regulate public utilities in matters affecting the health, convenience and safety of the general public”. The ordinance describes the “major problems and deficiencies” including meter inaccuracy, job loss of meter readers, meter vulnerability to hacking, surveillance use, and the threat to public health. It notes that the Smart Meter program could actually increase energy consumption.

The resolution advocates a no-cost opt-out for individuals and communities, and a moratorium until Phase 2 of the opt-out proceeding is completed, and “until the CPUC has fully investigated the health, safety, security, privacy, and consumer benefit complaints by holding evidentiary hearings.”

The ordinance takes effect immediately.

http://ci.sebastopol.ca.us/sites/default/files/events-and-meetings/ordinance_1057_smart_meter_moratorium.pdf
Smart Meter moratorium ordinance #1057

http://ci.sebastopol.ca.us/sites/default/files/events-and-meetings/resolution_number_5920_city_of_sebastopol_opt_out_smart_meters.pdf   Smart Meter resolution #5920

Santa Rosa Press-Democrat coverage: http://www.pressdemocrat.com/article/20130221/ARTICLES/130229912/1350?Title=Sebastopol-City-Council-OKs-SmartMeter-ban- http://www.pressdemocrat.com/article/20130220/ARTICLES/130229967

Posted in Uncategorized | Tagged , , , , , , | 1 Comment

Reports on Smart Meter Problems

Updated February 26, 2026

The 50-page paper “Overview: Fire and Electrical Hazards from ‘Smart’, Wireless, PLC, and Digital Utility Meters” is available free for downloading and printing, and can be viewed in parts for easy translation and printing – Part 1, Part 2, Part 3, Part 4. The report provides information from experts on utility meters used in the U.S. and Canada.

The report “Analysis: Smart Meter and Smart Grid Problems – Legislative Proposal” is available free to the public for downloading and printing. This 173-page report, released in 2012 by health and environmental advocate Nina Beety, has extensive referenced information on the many problems and risks of the Smart Meter program known at that time, with information from state, national, and international resources.

Investigation and admissions by the industry since 2012 continue to substantiate these serious problems, providing a searing indictment on regulatory and legislative officials who have failed to halt Smart Meter deployments.

Continue reading →

Posted in Uncategorized | Tagged , , | 9 Comments

Public Utilities Commission Hearings in Santa Rosa, Los Angeles, San Clemente, Santa Barbara, Bakersfield

CPUC Public Participation Hearings will be held on Smart Meters and the opt-out in Santa Rosa, Los Angeles, San Clemente, Santa Barbara, and Bakersfield. Please attend the hearing nearest you, and forward this information on to others concerned about this issue.

The PPHs are set for the following dates and locations:

BAKERSFIELD (PG&E and SoCalGas territories)

December 13, 2012 at 6:00 p.m. Bakersfield City Hall Council Chambers 1501 Truxtun Avenue Bakersfield, CA 93301

SANTA BARBARA (PG&E, SCE and SoCalGas territories)

December 14, 2012 at 3:00 p.m. County Administration Building Board Hearing Room, 4th Floor 105 East Anapamu Street Santa Barbara, CA 93101

LOS ANGELES (SCE and SoCalGas territories)

December 17, 2012 at 6:00 p.m. Junipero Serra State Office Building Carmel Room – Auditorium, 1st Floor 320 West 4th Street Los Angeles, CA 90013

SAN CLEMENTE (SCE, SoCalGas and SDG&E territories)

December 18, 2012 at 6:00 p.m. San Clemente Community Center  Ole Hanson Fireside Room 100 N. Calle Seville San Clemente, CA 92672

SANTA ROSA (PG&E territory)

December 20, 2012 at 2:00 p.m. Steele Lane Community Center  Dohn Room 415 Steele Lane Santa Rosa, CA 95403 Continue reading →

Posted in Uncategorized | Leave a comment